Remember I indicated that we would be messing up the floor (dirt) again?
The plumbing must be installed beneath the floor so here we go again!
|
|
First we have to mark out the plumbing pipe routs by figuring out where
each drain will be located. In a dome everything is measured from the domes
center pins. Had to dig them up from time to time! |
|
|
|
|
|
Stat digging! Just follow the lines. |
|
|
|
|
|
Once we got through the fill we hit the expansive
clay so we pulled out the jack hammer! |
|
The pipes are placed and the drain angle must
be set so everything drains properly.
There is no second chances here! |
|
|
|
|
Our plumber Dale and Joe assemble the drains in the kitchen. |
|
The lines are set all the way to the bathrooms in the private dome. |
|
|
|
|
Remember that flat smooth floor in the previous ?
Yep we have to do it again! |
|
|
|
|